Customization: | Available |
---|---|
Material: | Polyethylene/PE |
Usage: | General Plastics |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Compostable Plastics S1-01
Production Description
Features |
Application |
Totally biodegradable |
Blowing film |
Home compostable |
Bags |
Food contact |
|
Typical Properties
Properties[1] |
Test Method |
Test Condition |
S.I.Units |
Values[2] |
Material |
||||
Melt Flow Rate |
ISO1133 |
190ºC,2.16kg |
g/10min |
2.0~6.0 |
Specific Gravity |
ISO1183 |
23ºC |
g/cm3 |
1.25~1.30 |
Melt Point |
DSC |
- |
ºC |
110~130 |
Film Thickness 15μm |
||||
Tensile strength MD/TD |
ISO527 |
25ºC |
Mpa |
15/10 |
Elongation at Break MD/TD |
ISO527 |
25ºC |
% |
250/350 |
Tear Strength MD/TD |
ISO6383-2 |
25ºC |
mN |
1000/2000 |
Dart Drop |
ISO7765-1 |
25ºC |
g |
130 |
[1] Not to be construe as specifications
[2] The listed values are measured by test specification and used for referential purpose only.
Quality Control
The melt flow rate, MFR, at 190, 2.16Kg, according to ISO1133 has been defined as specified parameter for quality control. A certificate can be provided with each lot number upon request. In order to obtain a high accuracy for the MFR measurement, the granules should be dried for 4 hours at 80ºC.Other data given in our literature are typical values, which are not part of our product specification
Storage
Temperatures during transportation and storage may not exceed 70ºC at any time. Storage time in an unopened bag may not surpass 12 month at room temperature (23ºC).
Form Supplied
Grade name |
Form Supplied |
S1-01 S20 |
25kgs/package |
S1-01 S20L |
900kgs/Octabin |
Processing Conditions for Blowing Film
Setting |
Start Point |
Range |
|
Melt Temp. |
120ºC |
115-125ºC |
|
Barrel Zone Temp. |
Rear |
125ºC |
120-130ºC |
Center |
125ºC |
120-130ºC |
|
Front |
120ºC |
115-115ºC |
|
Die Head Temp. |
125ºC |
120-130ºC |
|
Processing Temp. Limit |
180ºC |
||
Pre-Dry Requirements |
80ºC, 4h |
Well packaged products can be used directly. If package is damaged before use, the product should be dried prior to processing. Moisture levels above 1000 ppm may impair film-blowing operation. Effective drying takes place at 80°C for 4 hours. The dried product should keep away from moisture. The data sheet is just for reference. In actual process, the parameter should be adjusted.